Commit Graph
3 Commits
Author SHA1 Message Date
glm-5.3-flash dc4ad2bc6d feat(review 007 Unit 1): Establishment carries the channel plan (R-01) + lifetime doc (R-02)
Implements ADR-049 amendment 2 — the reserved Establishment payload is
filled, and the OpenHandler lifetime contract is documented.

- Establishment { plan: Option<ChannelPlan> } with ChannelPlan =
  Arc<dyn Any + Send + Sync>: typed-opaque, because the payload an
  establisher hands the pump handler is a live handle (dialed socket,
  TTY handle), not JSON — the review's Option<Value> sketch could not
  satisfy its own verification gate. #[non_exhaustive] keeps a future
  carrier change from being another break. Construction:
  Establishment::new(plan) / Establishment::default().
- OpenHandler gains the plan parameter:
  Fn(Value, Option<ChannelPlan>, Connection, AuthContext) ->
  JoinHandle<()>. Separate parameter (not merged into input) — a
  typed payload cannot ride the JSON input; no schema collision.
  Wire surface unchanged: the plan is process-local (establisher ->
  wrapper -> handler).
- run_open_wrapper threads establishment.plan to the handler; None
  when no establisher is registered. Kills the alktunnels-POC
  side-channel handoff (resource-keyed slot + poll loop) whose
  concurrent same-resource race is now unreachable — each open's
  establisher result flows to its own handler.
- Lifetime contract documented (R-02, doc-only half): the returned
  JoinHandle must track the data-plane lifetime — the wrapper awaits
  it and its completion triggers teardown; early return = teardown
  at birth. Noted on the OpenHandler type docs and both registration
  entry points.
- Breaking at 0.6.0 (the point of landing it before alktunnels
  Phase 1): Ok(Establishment {}) sites become
  Ok(Establishment::default()) mechanically.

Verification: cargo test (621 passed, +4: plan-flows-to-handler,
concurrent same-resource opens get distinct plans, no-establisher
None plan, Establishment construction), clippy -D warnings, fmt
--check, doc clean, test --all-features clean.
2026-09-07 08:43:17 +00:00
glm-5.3-flash 2586c3b217 feat(review 006 Unit 1): channel-open establishment phase + typed client error (E-01, N-1)
Implements ADR-049 Unit 1 — the open-op wrapper gains an awaited,
bounded establishment phase, and the client stops erasing the error.

- OpenEstablisher hook + Establishment/EstablishmentError types:
  register_openable_with_establisher awaits the establisher bounded
  (earlier of dispatch deadline and per-registration timeout, else
  ESTABLISHMENT_TIMEOUT = 10s) after allocation, before the reply and
  before the pump handler is spawned (ADR-049 §1/§2). Implementation
  note: the establisher takes (input, auth) only — the channel's
  yield-once BiStream belongs exclusively to the pump handler
  (amendment recorded in ADR-049).
- Establishment failure: teardown_channel + opener-ledger take +
  policy.on_close un-increment (allocation and teardown balance;
  the ledger take is the atomic gate, ADR-047 §7), reply
  channel:open_failed with details {reason, message} — reason ∈
  dial_failed / unknown_resource / resource_shortage / handler_error
  / timeout (ADR-049 §3). SSH contract consumer-visible: a failed
  open never returns a channel_id.
- register_openable unchanged (no establisher = always-OK; existing
  registrations compile and behave identically — compat gate test).
- ChannelClient::open_channel returns ChannelOpenError (breaking at
  0.5.0): CallFailed { error: CallError } carries the wire error
  verbatim (establishment_reason() branches on details.reason);
  MissingChannelId / AdoptFailed cover the local-only shapes
  (ADR-049 §4, review 006 N-1).
- Tests cover all four verification gates from the review: e2e
  establisher failure through a real channels connection (typed
  reason + no-channel + ledger un-increment), bounded timeout,
  no-establisher compat, establisher-success pump round-trip; plus
  reason-vocabulary mapping and bound arithmetic.
- Bump to 0.5.0 (open_channel error-type change is semver-relevant).

Verification: cargo test (608 passed), clippy --all-targets -D
warnings, fmt --check, doc --no-deps, wasm32 check — all clean.
2026-09-06 19:00:04 +00:00
glm-5.3-flash 48ceeba55c docs: ADR-049 channel-open establishment phase; verify review 006
Verify review 006's findings against source at 88e3f5e (E-01..E-04
all confirmed; E-02 cost corrected — OperationSpec has no description
field, four touchpoints) and file three additional findings from the
same sweep (N-1 client error-type gap, N-2 write-only early-arrival
counter, N-3 pump-panic posture).

ADR-049 resolves E-01 + N-1: split-hook OpenEstablisher awaited
bounded by the open-op wrapper (restoring ADR-047 §3's "channel
plan" shape), teardown + typed channel:open_failed reply on
establishment failure, ChannelClient::open_channel typed error.
Review 006 gains the post-verification remediation plan and verdict
appendix.

Verification: cargo test (597 passed), cargo doc --no-deps clean.
2026-09-06 10:57:20 +00:00