glm-5.3-flash d25deb5eaf docs(review 007): mark R-01/R-02/R-03 resolved; record the two sketch deviations
Status → Resolved with the three unit commits; both deviations from
the review's sketches (typed-opaque ChannelPlan over Option<Value>;
(u64, u64) over io::Result) recorded up top with their rationale, as
the ADRs carry them.
2026-09-07 08:48:06 +00:00
glm-5.3-flash 6590ab005f docs: review 007 — establishment follow-ups (from the alktunnels UDP POC)
Findings filed to prevent a second fix->publish->update-dependents
cycle; each was reached by building working code against 0.5.0:

- R-01 [major] — Establishment is payloadless but the channel plan
  is exactly what establishers need to hand to the pump handler
  (ADR-049's own 'reserved for a channel plan' note). Costs verified
  in two consumers: alktunnels POC side-channel handoff (same-resource
  opens race the slot), alktty forced to keep backend allocate
  post-open in-band (allocate_failed stays an in-band frame — the
  shape ADR-049 eliminates, alive one layer down). Ask: fill the
  reserved field (plan: Option<Value>, process-local, wire unchanged)
  in a 0.6.0 sweep; the break is mechanical (Establishment::default).
- R-02 [minor] — the OpenHandler JoinHandle lifetime contract is
  undocumented and load-bearing: the wrapper's await of the returned
  handle IS the teardown trigger; a handler that returns before its
  pumps finish tears the channel down at birth (the POC found this
  empirically — every tunnel EOF'd instantly). Doc note + ADR-049
  amendment; optional debug warning.
- R-03 [minor, optional] — the ADR-078 two-pump helper's convergence
  test is satisfied (POC gives both shapes); extracting pump_bidi
  now is additive (no break) and pins the contract upstream. Decide
  in the same 0.6 sweep.

Non-findings: reverse-flow (-R) needs no upstream mechanism
(from_connection_with_serving + serving-side allocation, verified by
trace); establisher receives registry-validated input; typed
establishment errors complete on the wire; early-arrival cap
unchanged; EstablishmentError reason set sufficient.

Goal stated in the review: 0.6 is the last breaking sweep forced by
known work. alkcall tests: 617 passed (docs-only change; baseline
check).