- objective and settled stack (family ADR-002, published crate map) - load-bearing gitea surface template with walk rules (OQ-FG-01) - provisional needs-to-stack mapping and draft permission posture - upstream asks list draft (OQ-07 items per door) - seeded open questions OQ-FG-01..10, POC candidates, and the phase 0 convergence checklist Verified: dash hygiene check clean