Files
alkgen/docs
glm-5.3-flash a4ec8be3e8 chore(tasks): decompose wave 2 into implementation tasks
- w2-ssr-proof and w2-code-proof: the two consumer-shaped proofs,
  parallel by construction (own test binaries, own fixture modules
  per the wave-1 convention)
- w2-conformance-battery: the standing verification set, ordered
  after the proofs so it consolidates over the final wave-2 tree and
  absorbs any stop-and-book findings; folds the wave-1 gate's
  reminder (b) (wasm build standing, not ad-hoc)
- review-wave-2: the wave gate, depends on all three
- decomposition record added to docs/plans/implementation.md with
  the logistic-ordering rationale; wave-2 status flipped to
  decomposed

Verification: taskgraph validate (18 tasks valid); em-dash grep
clean on all changed files
2026-11-06 20:16:11 +00:00
..