The substrate release gate (substrate/review-wave-10) verdict, landed:
- OQ-21 outcome confirmed (posture evidenced; build deferral stands
verbatim; OQ-03's substrate publish-side blocker stays dropped)
- the substrate-side OQ-03 freeze inventory settled and reconciled
against the crate root's actual re-export list (recorded for
w10-publish to freeze)
- the release-readiness surface verified (docs, matrix incl. the three
off-matrix clippies, CHANGELOG/README, dry-run re-run; F-w10-B4/B5
+ N-3 dispositions confirmed)
- all flagged recorded interpretations confirmed (O-g future work,
the through-store probe stamp, mem_registry removal, testutil home,
LIVE_GATE stay)
- the test evidence read green; review 006 R-1..R-7 verified absorbed
Inline findings fixed in-session:
- D-1: the architecture README's status-index cells were stale since
the wave-5 flip; made truthful with the substrate.md/lfs.md
`stable` flips
- D-2/D-3: two task-record slips (the test-evidence Summary's
O-b/O-c cross-reference; the placement task's unticked ACs)
- D-4: DEFAULT_SCHEMA + LOCKED_OUT_RETRY_SECS promoted to the
crate-root re-export list (both module-path-public, never root
re-exported — the freeze authority byte-exact; additive pre-freeze)
Verification: cargo test (376/186), --all-features 379, the live-pg
harness run 212 passed 0 skips, the fuzz corpus gate 13 targets,
fmt + five clippy passes (-D warnings), cargo doc 0 warnings,
publish dry-run green, taskgraph validate (90 tasks).