Files
alkgit/tasks/architecture
glm-5.3-flash 8657e2ff9e docs(reviews): wave-5 release gate — green; the core-side OQ-03 inventory settles
The core release gate verdict (core/review-wave-5): all six wave-5
tasks read clean; all three OQ-19 riders served/dispositioned (rider
1 executed inline in the gate session after the operator confirmed
the decomposition report omitted it; rider 2 validated machinery-side
with the wave-7 substrate facet booked; rider 3's include-tag /
session-id dispositions confirmed); R-2's size-bomb cap confirmed as
landed and waved-8-inherited; the fuzz corpus gate green with clean
reported campaigns; the counting-reader residual accepted
(wall-clock-only); N-1's permit posture accepted; review 005's
no-split verdict stands; the feature matrix + dry-run + coverage
(94.22% lines) re-verified at the gate's tree; the doc-hidden
disposition and the crate-qualified tag convention recorded; the
OQ-03 core-side freeze inventory enumerated and settled (11 surfaces,
from the crate-root re-export list).

On green: transport/overview/backend flip to `stable`; OQ-19 closed
(resolved); the w5-publish task unblocks.
2026-10-23 12:15:21 +00:00
..