docs(tasks): decompose review-002 into 24 tasks (23 implementation + 1 bracketed follow-up)
Decomposition of docs/reviews/002-post-remediation-review.md per its 5-unit remediation plan: - Unit 1 (security-critical): gw15-publish-body-cap, prj16-schema-via-call (CF-004 filed alkcall-side), fwd13-dot-segments, fwd16-missing-capability, oai11-ref-memoization - Unit 2 (timeout/terminality): ws13-idle-progress, fwd15-stream-timeout, cli01-retry-after-budget, con17-mcp-pagination, con18-wss-sweep-exit - Unit 3 (projection/docs): projection-truthfulness, mcp-batch-cap, gw16-status-drift - Unit 4 (spec-import): yaml-normalization, oai13-path-item-wildcards, import-loudness-cluster, js01-placeholder-check, fwd17-19-contract-decisions - Unit 5 (WS polish + tests): con18b-ws-polish, client-policy-wire-tests, cov-deployment-knobs, cov13-dead-code, srv11-srv12-router-ordering - review-002-bracketed-followup: tentatively planned post-bulk pass (stale-check, OQA-18 enforcement decision, CON-08/09 close() lever, cross-crate re-checks) — deliberately not serialized against the bulk Also: review-002 numbering repair (CON-14 was double-booked; MCP pagination now CON-14, from_wss monitor renumbered CON-18, missing CON-14 section added). taskgraph: 66 valid, no cycles; 24 pending (all review-002); gen-1/gen-2 parallel waves identified; workflow-cost hotspots are prj16 (12.8) and ws13 (11.1), both carrying the reviewed slicing guidance in their Notes.
This commit is contained in:
@@ -0,0 +1,46 @@
|
||||
---
|
||||
id: review-002-mcp-batch-cap
|
||||
name: Cap MCP batch tool at MAX_BATCH_OPERATIONS (PRJ-22)
|
||||
status: pending
|
||||
depends_on: []
|
||||
scope: single
|
||||
risk: low
|
||||
impact: component
|
||||
level: implementation
|
||||
tags: [adapters, review-002, mcp]
|
||||
---
|
||||
|
||||
## Description
|
||||
|
||||
Review 002 PRJ-22 [minor]. The MCP `batch` tool has no cap on the
|
||||
`calls` array (`to_mcp.rs:215-247` executes serially) while HTTP
|
||||
`/batch` rejects at 101 (`routes.rs:173-184`,
|
||||
`MAX_BATCH_OPERATIONS`). A 10,000-entry MCP batch occupies the
|
||||
dispatch spine serially (each invoke up to the 30 s deadline) — the
|
||||
doc (PRJ-09's fix) advertises no limit either.
|
||||
|
||||
## Acceptance Criteria
|
||||
|
||||
- [ ] The `batch` tool enforces the same `MAX_BATCH_OPERATIONS` cap
|
||||
(share the constant; do not duplicate the literal) — over-cap →
|
||||
structured `INVALID_INPUT`-family error consistent with the
|
||||
tool's other argument errors (including `retryable`, per PRJ-13)
|
||||
- [ ] Tool description states the limit (mirroring how `/batch` docs
|
||||
it) — ADR-041 shape unchanged (4 fixed tools)
|
||||
- [ ] Test: over-cap `calls` array → structured error, no dispatch
|
||||
happened (spy/gateway-count assert via the existing invoke_tool
|
||||
harness)
|
||||
- [ ] `cargo test --features mcp`, `cargo clippy --all-features
|
||||
--all-targets -- -D warnings`, `cargo fmt --check` pass
|
||||
|
||||
## References
|
||||
|
||||
- docs/reviews/002-post-remediation-review.md (Part F', PRJ-22)
|
||||
- src/adapters/to_mcp.rs:215-247 (the loop), src/gateway/routes.rs:42,173-184 (the cap to share)
|
||||
- tasks/adapters/review-001-mcp-tool-fidelity.md (the PRJ-07..10/13 work whose conventions to follow)
|
||||
|
||||
## Notes
|
||||
|
||||
One of the smallest tasks in the batch — a good first warm-up slice or
|
||||
fold-in candidate if a session runs short (but keep the commit
|
||||
separate; it is its own unit of work).
|
||||