7bf0538416 chore: update task crypto-test-vectors status to completed 2026-06-10 07:05:25 +00:00
31936ef008 chore: update task derivedkey-zeroize-security status to completed 2026-06-10 06:17:15 +00:00
74a9dafb57 chore: update task encryption-salt-kdf status to completed 2026-06-10 06:11:30 +00:00
c88e97d7d5 chore: update task spec-update-secret-service status to completed 2026-06-10 06:08:57 +00:00
83ea66b5d1 chore: prep Phase 3 tasks and workspace for alknet-secret development
- Add irpc (0.16) and irpc-derive (0.16) as workspace dependencies
- Add irpc, irpc-derive, and secp256k1 (optional) to alknet-secret Cargo.toml
- Clarify encryption-salt-kdf task: Option B (document salt as reserved) is the
  chosen path per spec update, removing Option A acceptance criteria
- Update irpc-secret-protocol-integration task with concrete irpc crate details:
  real crate on crates.io v0.16, #[rpc_requests] macro, workspace config,
  AuthProtocol pattern reference, DerivedKey serialization considerations
- Fix secp256k1-ethereum-derivation task: correct crate name is secp256k1
  (not libsecp256k1), add version pin 0.29
2026-06-10 05:57:27 +00:00
9ec7627d80 chore: add Phase 3 secret-service decomposition tasks
9 atomic tasks for alknet-secret spec conformance and gap closure,
derived from architect's implementation review. Dependencies form
a 5-generation graph starting with spec update, then parallel
implementation tasks, ending with a review gate.

Tasks address: DerivedKey zeroize security, key caching with TTL,
irpc protocol integration, password derivation, secp256k1/Ethereum
derivation, encryption salt/KDF, crypto test vectors, and final
spec conformance review.
2026-06-10 04:14:39 +00:00
d1c57627c6 chore: update task review-core-bridge-phase2 status to completed 2026-06-09 11:37:34 +00:00
dc3c8208df chore: update task axum-http-router-scaffold status to completed 2026-06-09 11:28:55 +00:00
309a586403 chore: update task api-keys-dynamic-config status to completed 2026-06-09 11:02:13 +00:00
bdb0af499a chore: update task ssh-session-call-protocol-bridge status to completed 2026-06-09 10:57:51 +00:00
bfc92d4827 chore: update task raw-framing-interface-implementation status to completed 2026-06-09 10:53:33 +00:00
0be0df5e96 chore: update task credential-provider-trait status to completed 2026-06-09 10:52:33 +00:00
4d5fec3619 chore: update task listenconfig-http-dns-stubs status to completed 2026-06-09 10:51:19 +00:00
752e61df4f chore: update task stream-interface-message-interface-split status to completed 2026-06-09 10:35:34 +00:00
d7538a7806 fix(tasks): correct Phase 2 task 1 and 2 to match actual codebase state
Task 1 (stream-interface-message-interface-split):
- Document that TransportKind::Dns EXISTS and must be removed (was incorrectly described as 'never added')
- Document that TransportKind::WebTransport has { host: String } and must be changed to { server_name: Option<String> }
- Document that ListenerConfig is a flat struct, not an enum, and must be restructured per ADR-035
- Move ListenerConfig restructuring, InterfaceConfig rename, and TransportKind cleanup into task 1 to avoid overlap with task 2
- Add HttpListenerConfig/DnsListenerConfig/StreamInterfaceKind/MessageInterfaceKind to task 1 scope

Task 2 (listenconfig-http-dns-stubs):
- Remove work now covered by task 1 (InterfaceConfig rename, TransportKind changes, ListenerConfig enum creation)
- Focus on wiring the new enum form into Server/ServeOptions/StaticConfig, adding constructors, validation, and accept loop stubs
2026-06-09 10:00:23 +00:00
aafee72f4c Decompose Phase 2 (Core Bridge) into 8 dependency-ordered tasks
Phase 2 completes the interface-to-protocol bridge and adds core types
that external crates depend on. The 8 tasks are organized into 5
generations with clear dependencies:

- Gen 1: StreamInterface/MessageInterface trait split (must go first)
- Gen 2: SshSession bridge, RawFraming impl, CredentialProvider (parallel)
- Gen 3: API keys in DynamicConfig (depends on CredentialProvider)
- Gen 4: ListenerConfig HTTP/DNS stubs + axum scaffold
- Gen 5: Review gate before Phase 3

Key design decisions:
- 2.4a/2.4b split: SecretStoreCredentialProvider deferred to Phase 3
- API keys (2.6) must land before axum scaffold (2.7)
- ListenerConfig (2.5) must land before axum scaffold (2.7)
- Gen 2 tasks are parallelizable (separate modules)
2026-06-09 09:33:22 +00:00