Commit Graph
2 Commits
Author SHA1 Message Date
glm-5.3-flash 776844e2fb consumer: BindSession — the reply#2 reader + e2e suite
- BindSession::bind (open → no-auth → BIND → reply#1, capturing
  BND.ADDR) + reply1() (the BindReply1 handle) + await_inbound (the
  POC #5 read_reply2 — hand-read with the forked read_address codec,
  no second codec, ADR-011) returning BindDataPlane (into_inner /
  get_socket_mut + AsyncRead/AsyncWrite forwards)
- Teardown ownership (the CONNECT session's posture): Drop sync-reap +
  structural EOF, close() graceful, teardown-at-birth on in-stream
  refusals, no Clone (compile_fail-asserted)
- Typed error surface: open failures ride SocksSessionError::Open
  (ADR-049 reasons); the command gate's 0x02 and factory-failure
  reply#1 codes surface from bind as Rfc; accept-stage reply#2 codes
  surface at await_inbound
- tests/consumer-bind.rs: 9 e2e tests over the harness (round-trip,
  data-plane accessors, gate refusal, both failure mappings,
  quiet-wait garbage, drop teardown + health, the CONNECT+BIND
  regression guard, the Send probe)

Verification: cargo test (259 incl. the doctest), clippy -D warnings
(native + wasm), fmt, both wasm checks, cargo doc clean.
2026-09-24 00:51:46 +00:00
glm-5.3-flash a2483e4a84 tasks: decompose the protocol-core group — thirteen dependency-ordered tasks
Batch 1 of the Phase 1 decomposition: the default, wasm-clean crate
(producer + consumer + wire + seams + params/errors), per the
architecture spec set (ADRs 001-013) and the three POCs' validated
shapes. The assembly layer (local/composed providers, front doors) is
batch 2, decomposed after review-protocol-core opens.

- foundation: crate-deps (alkcall 0.8.0 first consumption), wire-codec
  (the ASSOCIATE frame + the joint bound), seam-types (the three
  ADR-004 seams), params-errors (the one-way-door surface)
- harness: duplex transport + identities + in-process seams (the
  alkcall 0.8.0 establishment surface proven before the producer)
- verticals: producer/consumer splits per command (CONNECT,
  ASSOCIATE, BIND) — each POC's scope, producer tasks test via the
  raw RFC client, consumer tasks e2e through the harness
- closing: integration suite (three-command regression, teardown
  matrix, identity matrix, docs sync) + review-protocol-core (the
  batch gate)

taskgraph: 8 generations, no cycles, risk path 2.55 (no high-risk
tasks). Also records the wire.md/bast.md len=0 residue (payload-level
F-2 is the operative invariant) as a doc-sync deliverable of the
wire-codec task.

Verification: cargo test (76 passed), fmt clean; taskgraph
validate/cycles/parallel/critical clean.
2026-09-23 07:38:27 +00:00