- OQ-SK-07: add a POC register table (one-place accounting of all five
numbered POCs: #1/#2/#4 passed, #3 dropped, #5 pending); mark the
priority order as historical; note numbering must not be renumbered
- §Vision: fix the components 1+2 layout sentence now that component 3
transferred; keep the transfer reasoning
- alknet-client ancestor section: replace the stale 'this crate's
client half rehomes that work' sentence with a historical note (the
rehoming is alknet's, per the 2026-09-14 scope decision)
- noq prior-art section + OQ-SK-06: add transfer banners so ~25 lines
of transferred research are not read as live scope
- OQ-SK-02: spell out what the 'yes / planes-don't-compare /
probably-not' shorthand maps to
- OQ-SK-04: note the component-3 transfer does not change the wasm
decision inputs
- OQ-SK-07 #3: rewrite the ambiguous 'at the time of the decision'
parenthetical as before/after
- Survey list: mark noq and iroh entries as alknet-facing background
- Convergence checklist: uncheck the POC item (BIND POC still pending)
and explain the checkbox semantics
Verified against the repo: findings files, POC crates
(alksocks-connect-poc 8 tests, alksocks-udp-poc 11 tests,
alksocks-fs5-wasm-poc exists), upstream line refs (fast-socks5
lib.rs:384-386 / server.rs:813-816 / 1195, noq runtime/mod.rs:44 /
endpoint.rs:162, alktunnels producer.rs:207,392), op name
channels/socks5/sub in both POC crates.
Verification: docs-only change; no build/test surface affected.