The POC-3 gates re-landed against the shipped crate in a dedicated
tests/e2e_server.rs binary (reusing tests/common; the mapping binaries
keep their single-writer posture): OpenSSH pty/shell + pipe exec,
-L/-R/-D+curl (the -R arrival leg and -D's direct-tcpip leg end to
end), git clone AND push (rev parity + CAS row), and six
decline-observability rows (unfeatured pty/-L/-R from real clients,
the sftp subsystem decline, the unknown-repo collapsed generic
denial — each pinned by its door-side decline event). All rows are
check-gated skipped-with-reason and deadline-bounded.
E2e-graph fixes (no src/ changes): per-row key workdirs, an
in-process port allocator below the ephemeral range, the fabric
registration settle, and event_capture::captured_with +
support::decline_event (poll-within-row-deadline event observation).
Verification: scripts/matrix.sh green (cargo test x6 builds, clippy
x2 -D warnings, fmt, doc); 10 consecutive all-features e2e runs
green. taskgraph validate: 42 tasks valid.
- Seven task files under tasks/implementation/: w5-decline-matrix,
w5-e2e-server, w5-e2e-client, w5-fuzz-harness, w5-release-readiness,
review-wave-5 (pure review), w5-publish (over the gate)
- Four independent implementation tasks (disjoint files) over the
landed waves; release readiness over all four; the gate stays a
pure review; the publish is its own task (the alkgit pattern)
- Interpretations recorded: gate-then-publish split, e2e vehicle
placement, matrix-runner vehicle, fuzz exposure shape, the
crate-qualified alkssh-v0.1.0 tag, no version bump (0.1.0 is the
manifest value)
- Plan doc: wave-5 row -> decomposed + the decomposition record
Verification: taskgraph validate (42 tasks) clean