Eight implementation tasks + the gate under tasks/implementation/, folding the wave-3 gate's four booked findings in as dedicated tasks (the gate's own disposition — wave-4 material, not wave-3 backports). Hardening set (server-side, independent of the client chain, scheduled first as cheap remediation): - w4-git-exit-close: booked item 1 — the git row's status-before-close by construction (the seam/shape decided + recorded in-task; the saturated-buffer scenario pinned on the wire) - w4-channel-not-held-rows: booked item 2 — the guard's wire rows on git/tty pipe/shell, per build (test-only) - w4-tty-coverage: booked item 3 — the channel_close-fired cancel path + the Closed/Break no-exit-chunk rows + the write_all no-deadline known-limit record - w4-router-collision: booked item 4 — the ListenRouter token-collision fail-closed pre-check Client chain (sequential logistically — one client Handler impl): - w4-dial: the russh client stack + the connection handle + the client Handler skeleton at fail-closed defaults, over an in-process fake-sshd server double - w4-op-rows: exec/pty, direct-tcpip, git exec over the shared grammar, the sftp client-side decline — the POC-3 §D.3 mechanics - w4-reverse-listen: the -R leg — forward requests + the acceptor registry + late-install (the wave's highest-risk task) - w4-lifecycle: the OQ-12 primitives (cancellable handles, clean disconnect, no reconnect policy) review-wave-4 depends on all eight. The gate's item 5 (upstream asks) stays booked with its owners — no task. Plan wave-4 section carries the decomposition record + four flagged interpretations; wave table status updated. Verification: taskgraph validate ✓ (35 tasks)
2.3 KiB
2.3 KiB
id, name, status, depends_on, scope, risk, impact, level
| id | name | status | depends_on | scope | risk | impact | level | |
|---|---|---|---|---|---|---|---|---|
| w4-tty-coverage | Wave 4 — tty coverage minors (wave-3 gate booked item 3) | pending |
|
narrow | low | component | implementation |
Description
Close the wave-3 gate's booked finding item 3
(review-wave-3 §Booked findings — "minors, one ticket's worth"):
- The
channel_close-fired per-channel cancel path is unexercised on the wire — only the teardown signal is. Land the wire row: a channel closing (client-side close on a served tty row) fires the per-channel cancel path (the cap release + the per-channel state teardown observed — the disjoint release sites the gate verified per row, now wire-witnessed for this path). - The Closed/Break no-exit-chunk close shape has no wire row — land the row(s): a session ending via the Closed/Break close shape emits no exit chunk (the derivation contract's close-shape class — the absent-report posture pinned, not just the happy paths).
- The tty stdout
write_allcarries no deadline — record as a known limit only (module docs): backpressure is bounded, liveness is covered by the inactivity timeout; no code change (the gate's recorded disposition — a deadline here is a behavior change, not a coverage minor).
Depends on w4-channel-not-held-rows to keep tests/tty_mapping.rs
single-writer (that task's rows land first; these land into the
settled file).
Acceptance Criteria
- Wire row: the
channel_close-fired per-channel cancel path (cap release + state teardown observed on the wire) - Wire row(s): the Closed/Break no-exit-chunk close shape
- The stdout
write_allno-deadline limit recorded in module docs (no code change) cargo test(+ per-feature +--all-features), clippy ×2 (-D warnings), fmt,cargo doc --no-depspass
References
- tasks/implementation/review-wave-3.md §Booked findings item 3
- docs/architecture/mapping.md §The exit derivation contract (the close-shape classes; the PTY-path rule-5 limit — the docs-posture template), src/tty_map.rs, src/channel_cap.rs (the release sites the rows witness)
- tests/tty_mapping.rs (the per-build matrix the rows join)
Notes
To be filled by implementation agent
Summary
To be filled on completion