glm-5.3-flash 89828170f4 Wave-4 general review (002): two live-proven bugs — the forwarder's permanent death after one failed reconnect (the failure arm the gate's test never covered) and the tx enqueue/publish paths' missing pg_notify wake (F-1's root cause, engine-side) — plus a max_size:0 open-hang, two narrow robustness gaps, doc mismatches, and the decode-duplication smell; reviews renumbered 001/002 per the alk* numbering pattern (references updated) 2026-10-09 22:01:04 +00:00
glm-5.3-flash a82c543b40 SQLite engine integration: lint removal, contract-suite adoption, backlog column (task sqlite-engine-integration)
- Remove the wave-2 lint suppressions from substrate/mod.rs; the
  six genuinely dead surfaces the removal exposed are cut, not
  suppressed, and registered D-32..D-36 in PROVENANCE.md
  (arg_opt_i64, ops::now_unix, queue_next_claim_at,
  Writer::try_acquire, UpdateWatcher::spawn,
  SharedUpdateWatcher::new); test-observation items
  (subscriber_count, the poll-interval default re-export) are
  honestly #[cfg(test)]-gated
- Contract suite: eight new version-stamped backlog rows
  (extent-clamp + boundary totality, duration-refusal,
  encode_payload round-trip, PayloadTooLarge-never-produced SQLite
  arm, drop=rollback no-ghosts, in-tx read-your-own-writes,
  enqueue-opts resolution, receiver close/save arms)
- Fix the exemplar row's real-engine sequencing defect: the held tx
  handle across the with_tx leg deadlocked any single-writer factory
  (mock-invisible; ADR-007's parking is the pinned behavior)
- SQLite factory: SqliteFactory in the new tests/contract_suite.rs
  target; all nine rows green against it; the factory contract
  (isolation + idempotent teardown) pinned
- Engine lib docs: the single-host and writer-parking posture
  statements surfaced under # Posture
- Gates: build/test/clippy -D warnings/fmt green; coverage 93.6%
  lines, misses confined to error arms
2026-10-08 16:15:43 +00:00