3 Commits
Author SHA1 Message Date
glm-5.3-flash 609dc3b39c review-004-fixes gate passed — all sixteen dispositions verified by code-read against the review's failure mechanisms (armor/state-machine/hardening/decision changes structurally match their tasks' Notes of record; every injected-panic/death/interleave test drives the real mechanism); no regressions among the review-004 inline fixes' pinned postures (tick drop-+-replenish, raw tx-form seed + mem has_offset_row, MAX_SLEEP_S caps, saturating claim stamp, register-failure unregisters, poison-recovery idiom, encode depth 127); records landed — review 004's recorded-findings items annotated with dispositions/task pointers (record reads closed), implementation.md gains the fix-batch review-rounds entry, task-file audit done with three minor hygiene defects fixed inline (stale placeholder lines incl. pre-existing ones in review-wave-3/release-readme, completed-AC checkboxes left unticked on five batch tasks, the gate description's fifteen→sixteen task count); gates green this session: build, server-less workspace tests, full live pg column vs harness pglo-poc (135+26+9), clippy -D warnings, fmt --check, fuzz corpus replay 6/6, wasm32 mem check, doc gate zero warnings, taskgraph validate (96); task -> completed 2026-10-11 15:25:26 +00:00
glm-5.3-flash c03c798e34 decompose the pg scheduler-classification twin (review 004 item 9 — recorded at the sqlite task's implementation: scheduler.rs:682 carries the identical renew flattening; the ADR-009 §1 arm set is already landed engine-neutral, pg implements to match) + gate wiring; taskgraph validate green (96) 2026-10-11 12:23:13 +00:00
glm-5.3-flash 9bbe645558 decompose review-004 recorded findings: 15 disposition tasks + the review-004-fixes gate (sqlite seam panic-safety, watcher-death subscribe + initial-stat, bridge alignment, scheduler classification, substrate SAFETY delta; pg forwarder hardening + diagnosability, BIGINT stamp decision + fix, log-facade decision; core offset pin + Display forging, mem doc notes, pg identifier note, tokio dev-dep normalization) — taskgraph validate green (95) 2026-10-11 09:42:29 +00:00