2 Commits

Author SHA1 Message Date
039a6ccfe1 fix: address review findings — CJS build (tsup), workflowCost signature, bottlenecks empty-graph test
- C1(critical): Replace tsc build with tsup for dual ESM + CJS output
- W2(warning): Change workflowCost to accept TaskGraph instead of TaskGraphInner
- S1(suggestion): Add test for bottlenecks empty-graph early return
- S2(suggestion): Document dangling-reference detection is unreachable via public API
2026-04-27 19:56:43 +00:00
131e3e929b Decompose architecture into 28 atomic implementation tasks
Break the @alkdev/taskgraph architecture specs into dependency-ordered
implementation tasks across 8 component directories: setup, schema,
error, graph, analysis, cost-benefit, frontmatter, api, and review.
Each task has clear acceptance criteria referencing specific architecture
docs. Three review tasks serve as quality gates at critical junction
points (schemas-and-errors, graph-complete, complete-library). The
dependency graph is validated acyclic with 9 topological levels enabling
significant parallelism across independent work streams.
2026-04-27 08:30:05 +00:00