Commit Graph

3 Commits

Author SHA1 Message Date
bd8a7b06d0 feat(setup/project-init): initialize TypeScript ESM project skeleton
- package.json with @alkdev/taskgraph, ESM primary, CJS compat exports
- tsconfig.json targeting Node 18+, strict mode, declaration output
- All production deps: graphology suite, @alkdev/typebox, yaml
- Dev deps: typescript, vitest, @types/node
- src/ skeleton: schema, graph, analysis, frontmatter, error modules
- test/ directory with 5 placeholder test files
- .gitignore and vitest.config.ts
2026-04-27 09:54:01 +00:00
131e3e929b Decompose architecture into 28 atomic implementation tasks
Break the @alkdev/taskgraph architecture specs into dependency-ordered
implementation tasks across 8 component directories: setup, schema,
error, graph, analysis, cost-benefit, frontmatter, api, and review.
Each task has clear acceptance criteria referencing specific architecture
docs. Three review tasks serve as quality gates at critical junction
points (schemas-and-errors, graph-complete, complete-library). The
dependency graph is validated acyclic with 9 topological levels enabling
significant parallelism across independent work streams.
2026-04-27 08:30:05 +00:00
e592caed57 Add architecture review findings and address documentation issues
Review of all ADR documents (001-007) and peripheral architecture docs
identified 3 critical, 10 warning, and 7 suggestion issues.

Addressed in this commit:
- W-1: Add draft qualifier to ADR-002 reference to incremental exploration
- W-2: Add Alternatives Considered section to ADR-001
- W-3: Add Document Lifecycle section to README.md (draft/stable/deprecated)
- W-4: Clarify includeCompleted semantics (only 'completed' status triggers exclusion)
- W-5: Document file I/O runtime constraints in frontmatter.md
- W-6: Add ADR reference to architecture.md redirect
- W-7: Verify CVE-2025-64718 (confirmed real, improved description)
- W-9: Convert workspace-absolute paths to relative/monorepo references
- S-7: Add future ADR-008 note to incremental-update-exploration.md

Critical issues (C-1, C-2, C-3) and remaining warnings (W-8, W-10, S-4, S-5)
were addressed by a parallel agent in a prior commit.

All 16 review tasks created and resolved.
2026-04-26 09:41:05 +00:00