alknet/tasks/meta/transport-layer.md
glm-5.1 5c820a41e9 tasks: decompose Phase 0a ADR foundation and mark prior tasks completed
Add 10 new tasks under tasks/architecture/ for Phase 0a (ADR writing):
- 9 ADR tasks (026-034) with dependency-ordered structure
- 1 review checkpoint task before Phase 0b spec writing

ADR dependency graph (3 generations):
  Gen 1 (parallel): 026, 029, 030, 031, 032, 034
  Gen 2 (depends on 029): 027, 028
  Gen 3 (depends on 027+028): 033
  Gen 4: review checkpoint

Also mark all 34 prior implementation tasks as completed — they
were finished but still showing as pending in the taskgraph.
2026-06-07 08:55:33 +00:00

1.1 KiB

id, name, status, depends_on, scope, risk, impact, level
id name status depends_on scope risk impact level
meta/transport-layer Complete transport layer — trait, TCP, TLS, iroh, ACME completed
transport/trait-and-types
transport/tcp-transport
transport/tls-transport
transport/iroh-transport
transport/acme-cert-provisioning
system high phase planning

Description

Meta task that clusters all transport module tasks. Once complete, the transport layer provides a clean Transport/TransportAcceptor abstraction with TCP, TLS (feature-gated), iroh (feature-gated), and ACME (feature-gated) implementations. All transports produce the AsyncRead + AsyncWrite + Unpin + Send streams that SSH consumes.

Acceptance Criteria

  • All transport tasks completed
  • Transport trait produces duplex streams consumed by russh::connect_stream() / russh::run_stream()
  • TCP, TLS, iroh transports all work end-to-end
  • ACME cert provisioning integrates with TLS acceptor
  • Feature flags correctly gate optional transports

References

  • docs/architecture/transport.md

Notes

To be filled by implementation agent

Summary

To be filled on completion