f9e350bf22727c0965d5f0da7a215e13b65104cf
Review pass in this repo: contract suite re-verified (11/11 pass under --test-threads=1 against the harness server; default parallel runs interfere across tests via the shared db/channels engine_for_test harness — each test spawns its own listener on poc:q/s/n and truncates shared tables, so parallel tests receive each other's notifications and race truncates). Recorded as a harness caveat in the findings with the Phase 1 note (per-test namespaces), NOT as a contract failure — every test passes in isolation. Findings invocation note + artifacts section updated; phase-0 frontmatter carries the verification qualifier. OQ-ST-03 closure text already folded by the POC session stands.
Languages
Rust
99.4%
Python
0.5%